Central Wastewater Treatment

Central Wastewater Treatment Plant with a capacity of 1500 m3/day started to receive wastewater as of May 2013. Wastewater Treatment Plant consists of pumping stations (3 units), compact unit, balancing pool, Sequencing Batch Reactor type activated sludge system and belt sludge dewatering system. Wastewater treatment plant management Mass Artım Sistemleri İnşaat San. Trade Inc. carried out by. Gebkim Central Wastewater Treatment Plant Environmental Permit was renewed on 10.01.2019.

If the pollutant concentrations of the participant activities meet the GEBKİM Channel Acceptance Criteria, they are connected to the sewer system without any pre-treatment and a Connection Permit is issued.